Customer
LKAB
The assignment
Arctic Infra has signed a deal with LKAB for a new project including excavation and pipe work. The project is a preparatory work for when LKAB are going to replace the railway yard in Kiruna.
Customer
Aitik
The assignment
The contract includes land and pipe work for the redevelopment of a 700m pipeline, additional roadwork and refilling of the pipeline.
Customer:
WPD Construction Sweden AB
The assignment:
Construction of all infrastructure at the windpark by the mountain. Including roadwork, construction of cranes, blasting, crushing aggregates and cable shafts.
Customer:
LKAB
The assignment:
Construction of pedestrian and cycle roads, including lighting.
Customer:
Boliden Mineral AB
The assignment:
Construction of infusion lines at Boliden’s site Aitik.
Customer:
Boliden Mineral AB
The assignment:
Milling and demolition of the current infusion lines at Aitik in order to expand the mine.
Customer:
Boliden Mineral AB
The assignment:
Rearmament and construction of a 1800 meter trench at the western Aitik mine.
Customer:
Boliden Mineral AB
The assignment:
Construction of a new pumping station at Sakajoki. The order includes ground, electricity and pipework.
Customer:
LKAB
The assignment:
Ground and building work for a washing system to minimize the high dirt level on vehicles. Includes concrete work, tractor pit for sediment, concrete cassette for flush tanks and three flush plates.
Customer:
LKAB
The assignment:
The project includes concrete, bridge and filling works